Everything you need to gather and submit for a complete ADU permit application in Ithaca, NY.

Required Documents

  • Completed building permit application form
  • Site plan showing existing and proposed structures
  • Architectural drawings (floor plans, elevations, sections)
  • Structural drawings stamped by a licensed engineer
  • Mechanical, Electrical, and Plumbing (MEP) plans
  • Energy compliance documentation (NYS Energy Code)
  • Copy of current deed or proof of ownership
  • Zoning compliance statement

Permit Timeline

1

Pre-Application Meeting

Optional but recommended — 1 to 2 weeks to schedule with the Building Department.

2

Application Submission

Submit complete package to the City of Ithaca Building Division.

3

Plan Review

Standard review takes 4–8 weeks. Complex projects or revisions may extend this.

4

Permit Issuance

Permit issued after all comments resolved and fees paid.

5

Construction Inspections

Schedule inspections at foundation, framing, rough-in, insulation, and final stages.

Common Mistakes to Avoid

  • Submitting incomplete plans — missing MEP or structural drawings are the #1 cause of delays
  • Not accounting for energy code compliance from the start
  • Forgetting to show utility connections on site plans
  • Starting construction before permit is issued
  • Missing required inspections during construction phases